SYSTEM ONLINE Trusted by 240+ industrial operators

Mission-critical
power & thermal
infrastructure, delivered.

SPM engineers, supplies and services generators, transformers and HVAC systems for data centers, hospitals, utilities and heavy industry — with lead times measured in weeks, not quarters.

0
Units deployed
0
On-time delivery
0
Field service
0
States served

// Authorized distributor & service partner

CUMMINS CATERPILLAR KOHLER GENERAC ABB SIEMENS EATON SCHNEIDER DAIKIN TRANE CARRIER YORK CUMMINS CATERPILLAR KOHLER GENERAC ABB SIEMENS EATON SCHNEIDER DAIKIN TRANE CARRIER YORK
LIVE · DATA CENTER DESIGN TOOL

Design your data center power & cooling. In under 5 minutes.

Enter your IT load, PUE, rack density, Tier rating and redundancy. Get a full equipment breakdown — generators, transformers, UPS, PDUs, chillers and CRAH units — sized from 100 kW edge cabinets up to 5 GW AI mega-campuses.

  • 100 kW → 5 GW range
  • Tier I–IV sizing rules
  • Power-block campus mode
  • AI rack densities (up to 130 kW)
Launch configurator ~ 5 min · rough estimate only
OUR INNOVATION // CASE STUDY 01

Fuel cell + absorption chiller. 85% combined efficiency.

Traditional power generation throws away most of its fuel as waste heat. Our trigeneration system captures it — a solid-oxide fuel cell generates electricity at 60% efficiency, then its 500°C exhaust drives a lithium-bromide absorption chiller for cooling instead of being vented to atmosphere.

85% Combined
system efficiency
2.4× Vs grid power +
electric chiller
−62% CO₂ emissions
per kWh delivered
FIG.01 — TRIGENERATION FLOW
INPUT FUEL Natural gas · H₂ STAGE 01 Solid-oxide fuel cell ELECTRICITY 60% eff. 500°C EXHAUST recovered OUTPUT Facility load Electric power STAGE 02 LiBr chiller +25% recovery COMBINED OUTPUT · 85% Power + chilled water
SYSTEM EFFICIENCY · SIDE-BY-SIDE
Conventional Grid + e-chiller
35%
SPM Trigen Fuel cell + LiBr
85%
60% electric 25% heat recovery +50 pts efficiency gain
01 — Product lines

Three core categories.
Engineered to spec, in stock or built to order.

From 20 kW standby gensets to 50 MVA substation transformers and 1,000-ton chiller plants — one supplier, one project manager, one warranty.

Generators

20 kW – 4 MW · Diesel · Gas · Bi-fuel

  • Standby & prime power gensets
  • Paralleling switchgear & ATS
  • Sound-attenuated enclosures
  • Sub-base & belly fuel tanks
  • Load bank testing & commissioning
Configure a generator

Transformers

15 kVA – 50 MVA · Pad · Pole · Substation

  • Dry-type & liquid-filled distribution
  • Padmount, polemount, station-class
  • Medium-voltage switchgear packages
  • DOE 2016 efficiency compliance
  • Fast-track 6–12 week builds
Spec a transformer

HVAC Systems

5 – 1,500 tons · Chillers · RTUs · VRF

  • Air- & water-cooled chillers
  • Rooftop units & air handlers
  • VRF/VRV multi-zone systems
  • Precision cooling for data halls
  • BACnet/Modbus controls integration
Spec a system
02 — Capabilities

Not just a parts catalog.
A full lifecycle partner.

01

Engineering & sizing

In-house PEs run load studies, short-circuit and coordination analysis, and arc-flash modeling so the spec lands right the first time.

02

Procurement & logistics

Direct OEM allocations and three regional staging yards. We expedite, crate, and dispatch — including over-dimensional permits.

04 — Selected projects

A few we're proud of.

DATA CENTER · 2025

14 MW hyperscale expansion, Phoenix AZ

Supplied (7) 2 MW Cummins QSK60 generators in 2N configuration with paralleling switchgear and 24,000 gallons of belly-tank fuel storage. Commissioned in 11 weeks against a 16-week budget.

14 MWStandby capacity
2NRedundancy
11 wkSite to commission
HOSPITAL · 2024

Level 1 trauma center, Denver CO

NFPA 110 compliant essential power system upgrade — 3× 1.5 MW gensets, dual 2,000 A ATS, and full-load testing during a live-facility cutover with zero patient impact.

UTILITY · 2024

69 kV substation rebuild, Texas Panhandle

Two 25 MVA station-class transformers delivered on accelerated 14-week build, with full protective relay packages and SCADA integration.

SPM turned what should have been a 9-month transformer lead-time into 14 weeks, and had crews on site the day it landed. They're the only supplier we trust for fast-track work now.
Dana Reyes · VP of Critical Facilities, Meridian Data
06 — Request a quote

Tell us what you need.
We'll respond in 24 hours.

Real engineers, not a form-routing bot. Send us a one-line, a single-line diagram, or a full spec package — we'll come back with sizing, pricing and lead time.

Reply within one business day.

Thanks — we'll be in touch within one business day.